What you say about the ultimate root cause analysis of a company failure is spot-on.
However, if production is down regardless of root cause, having engineers work overtime to bring it back up is probably overwhelmingly the right thing for the situation.
If they don’t and the company fails, it’s not because they didn’t work overtime (agreeing with you), but it would have been better if the downtime was 8 hours rather than 3.5 days (what I think whatshisface is saying).
However, if production is down regardless of root cause, having engineers work overtime to bring it back up is probably overwhelmingly the right thing for the situation.