>"we need so big number of them, that it's futile." I guess my grandchildren will die then.

You can build a lot of PVs and turbines in the same amount of time, and place them closer to where they're being used (reduce transmission loss). You can also place them on top of buildings (reduces AC load by 2%) and on top of parking lots (reduces car heat and urban heat island effect).

You're not going to electrify poor parts of the world with big, expensive, centrally-controlled fission plants.

>You can also cool with seawater.

The video addresses this. Seawater is often near fault lines, but that's not the biggest issue: transmission loss. If your power generation is on the coasts then you lose a lot of electricity powering the interior of the country.

>nuclear is still safe

Even if every nuclear accident was as "safe" as Fukushima, that's still a lot of wasted money. It will cost over $100 BILLION to clean it up. You can buy a lot of safe and renewable energy for that amount of money.




>You can build a lot of PVs and turbines in the same amount of time, and place them closer to where they're being used (reduce transmission loss). You can also place them on top of buildings (reduces AC load by 2%) and on top of parking lots (reduces car heat and urban heat island effect).

That was not the point. The argument was that nobody can build all the hundreds of nuclear plants that we would need. How can we build the millions of PV's and thousands of turbines?

>You're not going to electrify poor parts of the world with big, expensive, centrally-controlled fission plants.

Why not? It's probably the cost/watt that matters.

>transmission loss

Most of world population lives close to coastline.

>It will cost over $100 BILLION to clean it up.

Nuclear power might still be cheaper as a whole.


>How can we build the millions of PV's and thousands of turbines?

Those things fall off an assembly line. Nuclear power plants can't be massed-produced.

>Why not?

Who's going to invest that much money? While you're waiting around for a nuke plant and all of the infrastructure to be built, a few PV's can make a washing machine work and then girls can go to school.


You don't make wind turbine pylons or blades on assembly line either. You don't install solar panels to rooftops by assembly line. If nuclear gets enough momentum, large portion of the parts can be produced on assembly line too. But I think this is better covered by cost analysis than any argument about serial production.

If the absolutely poorest parts of the world are not going to get fission plants in near future, that doesn't mean places like China, India and Indonesia could not get them. This is what matters if we want to combat climate change. But I'm not opposed to solar panels either. Whatever can be done quickly that cuts CO2 emissions.