ADC #immediate is 2 cycles, as is ASL. Are you really multiplying a constant by 3 at runtime? Probably not. ADC zp is 3 cycles. Plus 2 cycles for the CLC.
Once I flew north-west at the time of sunset. I had the view of the most beautiful big red sun right at the edge a sea of snow white clouds for more than an hour.
I once needed a special blade for my saw. They only offered a 3-pack so I ordered that, and received 3 3-packs.
I don't know, but I felt that I should report it. Fiddled around for som time on their reporting pages, but absolutely no way to report that kind of error.
Are you in my neighborhood? You can have 3 saw blades for one GG1000 ;-)
Go for what you already have. Use your supervisor to cut and twist your proposal plan to fit 5 months. I don't know where in this world you are, but where I've taught, a master's thesis is about demonstrating what you can do in the time given towards a relevant result. A proposal is a plan. Relevant mileposts should be reached, and the final goal to some extend. But details can be adjusted and cut during the process. A supervisor should help with adjusting the project plan. Up front as well as during your project.
I think it should read:
At every place X in the following expression, introduce a boolean negation if there isn’t one and remove one if there is, and
Maybe even better:
At every place X in the following expression, introduce a boolean negation. If you get two concecutive NOT's, they can be removed.
Next, I don't see how
is the negation of